NEW Cooperative’s facility is an 8,000-ton-per-week feed mill with the following features:

  • 1,902 tons of ingredient storage in 22 bins
  • 9-ton batching and mixing system
  • Twin 40-ton-per-hour pelleting lines
  • Space for a future third 40-ton-per-hour pelleting line
  • Dual finished feed loadout driveway
  • 2,338 tons of finished feed storage in 20 bins
  • Tilt-up concrete ancillary buildings
  • 12,500-cubic-foot-per-hour receiving (300 tons per hour)
  • Two hammermill grinding systems (each at 35 to 44 tons per hour) and one rollermill grinding system (at 36 tons per hour)