This project consisted of a pre-mix facility building, a slipform construction tower with the capacity to store 2,204 tons of ingredients in 40 bins, a 9-story process tower with 3 batching and mixing systems, and a finished product truck loadout with a capacity of 285 tons of storage in 6 bins.

The ancillary buildings were made up of concrete tilt-up panels and include an MCC room and receiving building/truck loadout extension to host a 200 tph receiving system.

Additional features include a 12-bag tote unloading system, a single bag system, 2 bagging lines, and 3 tote fill lines located in the existing warehouse and connecting metal building.